Welcome to Highstreet Construction’s website. You’ll find schedules, longer term schedules, communication updates, and in the future we’ll add more resources here.

For now, enjoy, and provide any feedback or requests for more information on here to Tony (email not included so I don’t get hit with spam; you should know how to reach me).

PROJECTS

Brooklyn
Zone Maps, Roadblocks, and Schedules

Edgeview
Zone Maps, Roadblocks, and Schedules

Orion
Zone Maps, Roadblocks, and Schedules

Horizon
Zone Maps, Roadblocks, and Schedules

Altitude
Zone Maps, Roadblocks, and Schedules

Redhaven
Zone Maps, Roadblocks, and Schedules

Ridgeway
Zone Maps, Roadblocks, and Schedules

Woodsdale
Zone Maps, Roadblocks, and Schedules

Eros
Zone Maps, Roadblocks, and Schedules

The Bear
Zone Maps, Roadblocks, and Schedules

Atlas
Zone Maps, Roadblocks, and Schedules

Nova
Zone Maps, Roadblocks, and Schedules

Seacrest
Zone Maps, Roadblocks, and Schedules

Aviator
Zone Maps, Roadblocks, and Schedules

Highstreet’s vision is that everyone in our community will want their friends to work with us, live with us and invest with us.

The order is important, it starts with the people.

To make that happen in construction we are on a mission to have the safest, cleanest, most organized, professional, happiest, and most efficient construction sites in Canada. That is why you’re seeing changes. Here are some highlights:

Scheduling

We are changing how we are doing scheduling. This will require a shift in mind set for many trades and suppliers. The goal of the new scheduling system, which will impact all of our mission above, is to create a steady, flowing schedule so that the overall project is productive. We will lower stress, eliminate chaos, eliminate crash landings at the end of a project, and make the entire experience of working with us safer and happier.

For information on the new scheduling system, visit https://www.taktguide.com/

Everyone will need to move to a level workload based on a Monday-Saturday schedule, using half floors (NOT full floors) as the area we are tackling, with a three day “takt time”. Everything will move in the buildings on a steady, consistent beat in a three day rhythm. Every trade will have unfettered access to the area they are provided with no interference (without permission). The expectation as a result of that is you will finish and quality check as you go, and leave the area perfectly clean for the next trade when they take over that area. Please watch the videos and listen to the Elevate Construction podcasts to learn more.

The way we have done scheduling in the past has not worked, we are changing it, and we will hold to the schedule. Everyone will be accountable to hold the schedule. Everyone. 

Safety Expectations

We are implementing a safety culture that ensures respect for workers, and respect for each other. Our job is to make sure nobody gets hurt, we have to send people home to their families without injury, it is our responsibility. All of our responsibility.

We have created a list zero tolerance items for safety, that if any employee on site is caught doing, they will either be sent home to think about it for the day. We would be doing them a favour, and they need to think about being safe for their families and friends, and themselves. If they do it twice, they will be invited to never return to a Highstreet construction site. They probably shouldn’t be on a construction site if they didn’t get the message the first time, and it would be for their own good.

Safety Rules:
Two Violations = Site Access Revoked

Disciplinary process for not following the Safety Rules:

1) Sent home for first infraction.
2) Removed from all Highstreet sites for second infraction. 

  • You’re here to build something awesome. Be physically and mentally fit, not under the influence of drugs or alcohol, and no drugs on your person. If you are taking medications that can impair your abilities, please report this to your supervisor and have your supervisor determine if modified duties are appropriate.

2. Tie off when needed. Gear up and be secure.

  • Tie off is required and must be in place where the fall risk to the surface below is more than 3m or 10’ or as required by the Occupational Health and Safety requirements of the region.
  • Ensure tie off is in place 2m or 6.5’ from the leading edge.

3. Respect equipment safety radius and the operator. Stay clear and stay safe.

  • Make eye contact with operator before crossing path or approaching stationary operator. 10-foot radius on sides and 30-foot radius on front and back for moving equipment.
  • Nobody is carried in buckets, on forks, or in beds of trucks.
  • Respect exclusion zones/warning chains and set them up if you’re an operator.

4. Respect all sources of stored energy. Follow lockout/tagout procedure when working around stored energy including electricity.  Respect the power.

5. Permits are required for erecting crane, working in crane area, hot work, confined space work, working outside of work hours, working above 25’, working within 20’ of overhead electrical power lines, traffic control, excavations and trenching, and new and young workers. Permit in hand, you’re good to go.

6. Smoke or vape only in designated smoking space. Respect the team and keep the air clean.   

7. Report all hazards, near misses and injuries to the Site Superintendent. Speak up.

8. Modifying guards – Obtain Authorization before modifying or removing safety critical equipment. Guards keep you safe.

Finally, while it should not need to be stated, physical violence or the threat of violence against any other worker will result in permanently being removed from Highstreet sites. Doing anything not captured in the Safety Rules that could obviously result in serious injury or death is also cause for being sent home (ie: trying to move a stack of drywall if you’re not a drywaller. Shooting nails at a target from an air gun).

Cleanliness Expectations

Just like safety is about respect for yourself and your fellow workers, so is cleanliness. We are going to be professional on site, and part of that is always cleaning up after ourselves.

I’ve always wondered why it’s acceptable to leave garbage lying around or materials or waste on a construction site. We don’t do it at home. Why is it any different than a lawyer’s office or accountant’s office? They don’t throw their coffee cups or lunches on the ground or leave their papers lying around in the boardroom when they’re done. Aren’t we all just as professional as them? Respect each other, respect yourself.

We expect all of our employees and trade partners to clean up after themselves as they work. At a minimum, part of the working day includes cleaning the area you are working in at the end of the day. Just like you don’t leave your dirty dishes on the table at home, we will clean up after ourselves at work.

The expectation is 100% cleanliness at the end of every day. That means cleaning up sawdust from drilling and cleaning up all excess and cut off material and disposing of it in the appropriate recycling or garbage bins or cans that Highstreet provides.

We also expect that you will not deliver excess material to areas you are not working in yet or leave excess material in areas that you have finished in. Clean as you go.

To be clear, we will stop work if we find areas that are not kept clean, we will be asking workers to stop what they are doing and clean up.

Quality Expectations

You are all the experts when it comes to quality. We’re not going to give you complete lists of everything. We are now expecting our trade partners to check the quality of your own work and we will spot check, check on first installation of new scope, and set the expectation if it’s not clear already.

You all know what’s acceptable or not. You know your craft. 

Everyone has the authority to stop work and call our Site Superintendent or Interior or Exterior Lead to point out a quality issue that will impact your work or cause rework. Get it fixed right away! You can stop the workflow, everyone is empowered. It will save time and money.

Schedule Roadblock Removal

As we get more dialed in on the schedule and implement the new system, it is imperative that all trades, either PMs or foremen or the workers installing tell us what might hold you up and prevent us from hitting the schedule. The foremen have an opportunity daily to bring up issues and should come prepared to the afternoon Foremen Huddle and Weekly Trade Partner Tactical meeting having reviewed the schedule and looked at the coming work in person to see if there are any issues. We are on a new mission to get stuff out of the way. The further out the better, let’s get better together.

We are on a mission to have the safest, cleanest, most organized, professional, happiest, and most efficient construction sites in Canada. Let’s make it happen together.

Scott Butler

CEO, Highstreet